Background
A commercial building project in Broadbeach on the Gold Coast QLD, needed a dewatering solution during construction.
Objective
Set up a dewatering system for the job site during the construction of 3 basements and the first 4 storeys of a high rise building.
The system included solids settlement and parameter monitoring and login to comply with the Dewatering Management Plan.
Solution
PR Water provided two HB60 Clarifiers which use lamella plate technology to remove suspended solids from the water and safely discharge to storm drainage.
As a compact skid mounted unit with an effective settlement area of 40sqm, the HB60 clarifier was the perfect solution for this site due to the limited access and restricted space.
- A higher flow rate was achieved with two HB60 units
Explore the PR Water HB60 Clarifier >
Enquire Today