Background
Located in Mermaid Beach on the Gold Coast QLD, a commercial building project required a dewatering solution.
The dewatering system needed to provide dry building conditions during the construction of 4 wells, 2.5 basements and 4 first storeys.
Objective
The main goal of the dewatering system was to remove the hydrocarbons from the water during the first month of the project.
Provide chemical pre-treatment for solids control and use media filtration for filtering the hydrocarbons.
Solution
PR Water provided a flow and pH proportional dosing system to maintain control of the solids and pH in the water.
Solids removal was achieved with a HB60 Clarifier and monitoring services were provided for the duration of the project.
- Optimum settlement was achieved with the PR Water HB60 Clarifier unit.
Explore the PR Water HB60 Clarifier >