Background
A dewatering project on a commercial building site located in Labrador, North Gold Coast, QLD.
Objective
Set up a dewatering system for the job site during the construction of the basements and the first 4 storeys of a high-rise building.
Control solids, pH and metals using an automatic dosing system to comply with the dewatering management plan.
Solution
PR Water provided a system which automatically dosed chemicals for pH control and aerated the water to oxidise the dissolved metals.
3 HB60 Clarifier units were supplied to remove the high concentration of suspended solids using settlement.
- HB60’s operating parallel are able to achieve a higher flow rate.
Explore the HB60 Lamella Clarifier >
View our Branch Locations >
Enquire Today